Projects
Mining industry Nefteyugansk SIEMENS gas turbine equipment from Norchepping, Sweden to Noviy Port – Priobskoe deposit (custom clearance in port of Murmansk) 3 turbine weighing 102 T, L*W*H 11.5 m * 4.1 m * 4.9 m each, 3 generators: 72 T, L *W*H 6.15 m * 3.4 m * 3.8 m each. Construction of temporary ship landing area on an unequipped shore, road construction en-route, installation on foundation.
Mining industry Nefteyugansk SIEMENS gas turbine equipment from Norrköping, Sweden to Noviy Port – Priobskoe deposit (custom clearance in port of Murmansk) 3 turbine weighing 102 T, L*W*H 11.5 m * 4.1 m * 4.9 m each, 3 generators: 72 T, L *W*H 6.15 m * 3.4 m * 3.8 m each. Construction of temporary ship landing area on an unequipped shore, road construction en-route, installation on foundation.
Diesel generator units by MAN, en-route from port Hamburg, Germany to port Arkhangelsk, Russia to diamond deposit named after. Lomonosov, Arkhangelsk region (custom clearance in port of Arkhangelsk)
Delivery of the world’s largest industrial mill for the gold excavating factory at the Natalkinskoe gold deposit.
GE Locomotive units sea-transportation and transshipment in port, rail road transportation from Baltimore, United States to Astana, Kazakhstan (transit clearance in port of St. Petersburg) 8000 m3, 5000 T max. dimensions: 7 m * 3.5 m * 3.1 m
Transportation of presses weighing 126-150 T en-route from Tolyatti to Ulyanovsk
SIEMENS gas turbine equipment from Norrköping, Sweden to Tuapse, Oil Refinery (custom clearance in port of Tuapse) Loading on a ship, sea transport, custom clearance, transportation by truck, rigging and transshipment, installation on foundation. 3000 m3, 1200 T max. dimensions: 102 T, 11.5 m * 4.1 m * 4.9 m.
Reactors, JSC «Uralhimmash» Yekaterinburg - JSC "Saratov Oil Refinery", Saratov. Reactor weight 165 T, length 17m, 4 m diameter Total 2 units. Bridges, overpasses.
Reactors, JSC «Energomash (Volgodonsk) - Atommash» Rostov region., Volgodonsk - JSC "Saratov at Oil Refinery" Saratov. Reactor weight 170 T, length 18 m, diameter 4.05 m. Total 2 units. Bridges, overpasses, temporary boat landing.
Loading-unloading operations and delivery of oversized and heavyweight equipment to the site of JSC "Saratov Oil Refinery".
Transshipment and movement / transportation of hydrocracking reactors (2 units) at the site of Omsk Oil Refinery. Weight - 315 T (1 item), length 24 m, diameter 4.15. On site works at Oil Refinery: road construction, platform construction.
Transportation of oversized equipment (reactors 4 items) en-route from Yekaterinburg to Nizhnekamsk.
Transportation of oversized equipment (reactor 168 T, length 13.5 m, diameter 4.84.) en-route from Yekaterinburg to Moscow.
Transportation of two columns for reforming (in sections) en-route from Tambov to Ryazan for Ryazanskij Oil refinery.
Loading-unloading operations and delivery of oversized and heavyweight equipment to the site of JSC "Saratov Oil Refinery». Storage tanks, reactors, columns max weight 115 T, max length 32 m, max width 4.3 m.
Transportation of 10 columns for gasoline hydro-treatment catalytic cracking, max. length 38 m, diameter 3.36 m, weight 55 tons at the Ufimskij Oil Refinery.
Transportation of a column, length - 38 m, diameter - 5 m en-route from Yekaterinburg to Novokuibyshevsk.
Transportation of 4 reactors, including reactor weighing 1300 T, for Achinskij Oil Refinery en-route from port Marghera, Italy to Krasnoyarsk. Loading-unloading operations, using double gantry systems SBL-1100 at rolling-out location in Kubekovo.
Transportation of 10 units of oversized oil and gas equipment en-route from Antwerp, Belgium to Ryazan, Russia.
RollsRoyce diesel generator units from manufacturer factory in Bergen, Norway –to Arkhangelsk, Russia (custom clearance in port of Arkhangelsk). 1200 m3, 650 T: Diesel generator units weight 57.5 T, L*W*H 6,5*2,8*4,6. Winter road, temporary roads, pontoon ferry.
Lifting / transshipment of transformers, Novovoronezhskaya Atomic Power Station. From 72 T to 265 T.
Transportation of two heat-recovery boilers as one assembly en-route from N. Novgorod to Yekaterinburg.
Transportation of 8 transformers weighing 178 tons en-route from boat landing Kalach-na-Donu to Volgograd, off loading, installation.
Transportation of 7 reactors, weighing 83.3 tons, transshipment at rail road station Vnukovo - Substation Ochakovo, Moscow.
Transportаtion of 2transformers weighing 197T, en-route from Presnja rail road station to Electrical substation Presnja.
Transportation of an Alstom gas-turbine unit en-route from port St. Petersburg to - Yekaterinburg
Transportation of 2 Alstom gas-turbine units en-route from port St. Petersburg to Nizhniya Tura
Transportation of Siemens power plant en- route from port St. Petersburg to South Uralsk.
Transportation and maintenance operations of 3 waste-heat boilers en-route from port Moscow to Chelyabinsk.